Assessments and Reports

Arboricultural Report

Proposed Green Energy Park Asland Walks Bretherton, Lancashire – Arboricultural Impact Assessment

Tree Survey to BS5837:2012

Tree Survey – Sheet 1 of 6

Tree Survey – Sheet 2 of 6

Tree Survey – Sheet 3 of 6

Tree Survey – Sheet 4 of 6

Tree Survey – Sheet 5 of 6

Tree Survey – Sheet 6 of 6

Archaeological Reports

Asland Walks Energy Park – Borough of Chorley Lancashire – Geophysical survey – report 6025r – April 2025

Asland Walks Energy Park – Assessment report on an Archaeological Evaluation – Report Number YA/2025/213

Aviation Reports

Proposal for Wind Turbine Instrument Flight Procedure (IFP) Safeguarding Assessment

Warton Aerodrome – Assessment of Instrument Flight Procedures

Addendum to GA Pet Food Wind Turbine, Warton Aerodrome CNS Safeguarding Assessment Report, 72054 001 dated 28th Nov 2024

IFP Safeguarding – Wind Turbine (Onshore) – Blackpool Airport

GA Pet Food Wind Turbine – Warton Aerodrome CNS Safeguarding Assessment
Report

Technical and Operational Assessment (TOPA) – For GA Pet Food Partners, Plocks Farm Wind Farm Development – NATS ref: SG32728 – Issue 1

Radar Risk Assessment – Turbine Near Southport – Renewables First Ltd

Battery Storage Reports

Stortera – Energy Local – Feasibility Report – Battery Storage Arrangements for Bretherton

Ecology Reports

Asland Walks Energy Park- on behalf of The Bretherton Energy Co-Operative and GA Pet Food Partners – Ecological Assessment Report

Appendix 1: Extended Habitat Survey Report- 2025 Update

Appendix 2: Ornithology Baseline Report

Appendix 3: Bat Baseline Report

Appendix 4: Biodiversity Metric Issue (Excel file)

Appendix 5: Biodiversity Net Gain Report

Appendix 6: Collision Risk Model Calculations

Appendix 7: Report to Inform a Habitats Regulations Assessment

Agricultural Land Classification – Plocks Farm, land beside River Douglas

Economic Reports

Securing the Future of GA – Report v5.0

Securing the Future of GA – Asland Walks Energy Park Supporting Statement

Flood Risk and Drainage Reports

Asland Walks Energy Park, Tarleton – Drainage Strategy

Asland Walks Energy Park, Tarleton – Flood Risk Assessment – Revision 4.0

Foundation Statement

Foundation Engineering Design Statement for Proposed Wind Turbine, Asland Walks

Glint and Glare Reports

Solar Photovoltaic Glint and Glare Study – GA Pet Food Partners – Plocks Farm – October 2024

Heritage Reports

Asland Walks Energy Park, Lancashire – Heritage Statement – On behalf of the Bretherton Energy Co-Operative and GA Pet Food – Project no. 5831 -November 2025

JRC Consultation Reports

GA Pet Food Partners Wind Turbine – JRC Consultation Response

Noise Reports

Asland Walks Renewables Project – Noise Assessment based on 1x 111m Hub height Wind Turbine and 1x Solar Farm

Non Technical Summaries

Wind Feasibility Study – Non-technical Summary

BEP – Asland Walks Feasibility & Optimisation – Non – technical summary

Safety Assessment Reports

GA Pet Food Partners – Wind Turbine Risk Statement

Shadow Flicker Reports

Shadow Flicker Impact Assessment – GA Pet Food Partners – Plocks Farm – April 2025

Site Layout Reports

BCAL – Landscape Structure

ASLAND WALKS : Preliminary Landscape & Recreation Strategy

Social and Eco Benefit Reports

Landscape and Visual Appraisal – Asland Walks Energy Park, Lancashire

Final Report Submission by The Centre for Waste and Resource Management – School of Engineering and Computing – University of Central Lancashire

Final Report Submission by The Centre for Waste and Resource Management – School of Engineering and Computing – University of Central Lancashire – Part 2

Locality – Bretherton Parish Council – Community Engagement Survey Report

Transport Tetratech

Route Survey Report

Transport Assessment

Outline Construction Traffic Management Plan

Visual and Landscape (LanPro) Reports

Landscape and Visual Appraisal – Asland Walks Energy Park, Lancashire